This project required solving problems from the ground up — literally. The team demolished and excavated existing concrete to pour a reinforced structural pad capable of supporting equipment weighing up to 30,000 pounds per unit. A riser room and fire suppression system were installed to manage operating temperatures near 2,000°F. The retorts and concrete-lined stacks were set through a coordinated rigging operation, with extensive value engineering handled in the field throughout the project.